United States Department of State

TDR was tasked with the evaluation and review of the Department of State RF distribution and headend systems. The project included the transition from analog to digital conversion. It included the review of signal acquisition, signal processing, and finally signal distribution. TDR documented the existing system while preparing a plan for implementation of an expanded system. TDR design and specified new space requirements and both physical and mechanical system requirements (heat load, power, cable pathways, etc.)